Draft for comments: KJV2026 Grid code specifications for demand connections

We would kindly ask your feedback for the requirements
Please go through the requirements presented in this slide deck and consider what would these mean to your assets, what would be the technical solution and impacts on the design to meet the proposed requirements. Bring as much technical data/background when giving feedback in order to get your message through. You can ask clarifications before giving the feedback.

Timeline for sending feedback is 6.6 – 31.8.2025
Send feedback and/or ask clarifications via email in Finnish or English
Teemu Rissanen, Expert
email: firstname.lastname@fingrid.fi

  • Please name the email topic; “KJV2026 feedback”
  • You can write the feedback in email directly or prepare a document. Please bring out clearly which requirement you refer to e.g “13. Active power Control” or “17. Instrumentation..”